Recommended spacing is between 6 and 10 ft.
Galvanized roof anchor intsallation.
Screw the new panel in place as described.
Metal roofing is also available in the form of shingles.
Enjoy the videos and music you love upload original content and share it all with friends family and the world on youtube.
Intended for permanent applications cb anchors are compatible for installation onto wood steel and concrete substrates fasteners are included for wood and steel applications.
The g s sheets shall be laid with a minimum lap of 15 cm at the ends and two ridges or corrugations at each side.
Guardian fall protection cb galvanized roof anchor the cb anchor series are perhaps the most proven fall protection anchors on the market.
Recommended spacing is between 6 ft.
Install the panel so that the short lip overlaps the large lip.
Installation of any fall arrest system incorporating this roof anchor must be certified by a qualified engineer or competent person.
To install corrugated roofing start by cutting your panels to length with an angle grinder.
Roof anchors must be installed and spaced a maximum of 20 ft.
You may need to cut panels to fit angles using a circular saw with a metal saw blade.
Fasten it with galvanized screws with plastic washer caps by using a screw gun.
Continue adding panels until the roof is covered.
The normal pitch adopted shall usually be one vertical to 3 horizontal.
Installation around the perimeter of the leading edge areas is recommended to ensure compliance and allow the user to easily switch from anchor to anchor.
The g s roof shall not be pitched at a flatter slope than one vertical to 5 horizontal.
Installation around the perimeter of the leading edge areas is recommended to ensure compliance and allow the user to switch from anchor to anchor.
From edge of roof.
The anchor post functions to extend though roofing so that it is accessible both during and after roof construction and is compatible for use with srls vertical lifelines horizontal lifelines and shock absorbing lanyards.
Place the first screw at the outside bottom edge add screws at the other edge and the top of the panel to secure it and finish fastening it with screws about 24 inches apart.
Installation procedure of galvanised sheet roofing 1.
Roof safety anchor systems csa compliant stainless steel and or galvanized suspended stages anchors are manufactured in our facilities by cwb certified welders and are designed for use with bosun chairs lifelines equipment tie backs and in general fall protection and restraint applications to prevent falls.
The silicone will spread and adhere creating a seal.
Next pre drill holes on the end and side ridges of the panels spacing the holes 6 to 8 inches apart.
Beginning at the outside edge of your roof place each panel directly onto the purlins that are attached to the roof trusses.